Tuesday, June 17, 2008
Monday, June 16, 2008
ISP Programer
Well Stew was busy on Saturday so i thought that I would jump right in and build my Atmel programmer. Was really easy to do and worked first time. Soon after that i was programing my first chip with it and got it blinking an LED in no time...
Saturday, June 14, 2008
Friday was Puzzle day...
Build Day 2
Well we bought a few right angle clamps to keep the frame square, but after attaching the first one to the frame and then checking the other side with a tri square we bought.... things were not aligning. It turns out the expensive tri square we bought is not quite square....
We then cut the the 4 strengthening bars, drilled the holes for them and attached them to the frame.
We were going to rivet the bars to the frame but thought it would be best to bolt them on as we might want to use the same bolts for the landing gear or camera mount at a later stage.
Well now with the frame pretty much done and only weighing 296g things are looking good in the weight department. We hoping for a weight of not too much more that 1kg as we would like to hover at about half throttle. We have done some testing and it seems with the 4 motors we should get about 2.4kgs of thrust.
Mock up with right angle clamps.
Mock up of strengthening bars.
Mock up with holes drilled.
Final outcome after it had all been bolted together.
Just a pic to for us to keep track of weights...
We then cut the the 4 strengthening bars, drilled the holes for them and attached them to the frame.
We were going to rivet the bars to the frame but thought it would be best to bolt them on as we might want to use the same bolts for the landing gear or camera mount at a later stage.
Well now with the frame pretty much done and only weighing 296g things are looking good in the weight department. We hoping for a weight of not too much more that 1kg as we would like to hover at about half throttle. We have done some testing and it seems with the 4 motors we should get about 2.4kgs of thrust.
Mock up with right angle clamps.
Mock up of strengthening bars.
Mock up with holes drilled.
Final outcome after it had all been bolted together.
Just a pic to for us to keep track of weights...Well now that most of the frame is done, we need to start working on some of the electronics. First thing we will be doing is getting the electronic speed controlers that power the 3 phaze motors, to run off our microcontrolers (Atmel Mega8's) we will be generating a PWM signal that will tell the speed controler at what speed to run the motor at...
Wednesday, June 11, 2008
quadcopter.org Project
Well myself and a mate stew have started work on a new project quadcopter.org
The aim is to build a 4 rotor helicopter with a autopilot system that we will write.
The Quadcopter will contain a few custom built components eg. computer controlled speed controllers, electronic compass, accelerometers, gyros, GPS, GSM module for long distance controling over the cellular network and a wifi module for the closer range controling.
It will also carry a long range camera so we can navigate or just look while the auto pilot is flying....
You can follow the build at www.quadcopter.org or here on my blog..
Here are a few pics from the first build night... we had a few planning nights befor this but this is the first "Build night"
My new work bench in my now very clean garage.
The door we using as the table top is a bit narrow so as soon
as we can get a new door we will replace it.
The aim is to build a 4 rotor helicopter with a autopilot system that we will write.
The Quadcopter will contain a few custom built components eg. computer controlled speed controllers, electronic compass, accelerometers, gyros, GPS, GSM module for long distance controling over the cellular network and a wifi module for the closer range controling.
It will also carry a long range camera so we can navigate or just look while the auto pilot is flying....
You can follow the build at www.quadcopter.org or here on my blog..
Here are a few pics from the first build night... we had a few planning nights befor this but this is the first "Build night"
The door we using as the table top is a bit narrow so as soon
as we can get a new door we will replace it.
Monday, April 7, 2008
Sunday
Weekend Full Of Fun
Well Friday started off with a bang...
We started at CoolRunnings where every one was looking a bit down from a long week at work... But the vibe soon picked up and we were all back on track for a great weekend..


After Cools we headed to Zeps...
Oh Ye and I had a hair cut on Friday too.. (Cuz Mandy refused to cut it for me)
We started at CoolRunnings where every one was looking a bit down from a long week at work... But the vibe soon picked up and we were all back on track for a great weekend..